Thursday, January 21, 2016

Phase 1, Step 1 - Progress to Date!

Up until this point a majority of the work done has been the footwork to start the transformation of the current foundation into a usable outdoor space. In the fall of 2015 proposals were gathered from local engineering firms for both the assessment of the foundation – to see if it could be used in some capacity- and to develop construction plans to transform it from its current state into a covered, functional area.

At the end of November 2015 the proposal that best fit our needs and price range was chosen by the Robson PAC. The proposal then went to be revived and accepted by three different stakeholder groups – School District Maintenance, RCS Teachers, and RCS Society. All parties were happy with us accepting the proposal and moving forward with the project, so in early December a contract was signed for the assessment of the foundation.

On January 8th, 2016 a quick visual inspection of the foundation took place. On January 18th two holes were dug to check the depths of the footings and dimension measurements were taken. The engineer is going to use this information to determine our best options moving forward. Following his report, due January 29th, a concept meeting will take place were the interested parties will discuss the future structures possibly uses, and identify the desirable features based off these uses.

This should help us roll right along into our second contract with the engineer, construction plan development!  

No comments:

Post a Comment